Kitchen and bath remodels
A remodel that lifts a floor, opens a wall or takes down a ceiling goes through the survey first. The samples tell the crew which parts of the room are asbestos work.
Typical cost in Torrance
A remodel that opens walls, floors or ceilings and a teardown both fall under Rule 1403. We have the building surveyed, file the district notice online and remove what the samples confirm before the other trades start.
Taking out a load-supporting wall counts as demolition under the rule, even inside a house that is otherwise only being remodeled.

A remodel that lifts a floor, opens a wall or takes down a ceiling goes through the survey first. The samples tell the crew which parts of the room are asbestos work.
Taking out a load-supporting wall is demolition, so the district notice applies whether or not asbestos is found. Opening a non-bearing wall is renovation.
A teardown needs the survey, the district notice and, at the permit counter, a copy of that notice. We take on the asbestos part before the demolition contractor starts.
Condominium, townhouse and apartment jobs follow the same survey and notice rules, without the carve-outs written for a residential single unit dwelling.
State law, as South Coast AQMD describes it, asks a demolition permit applicant to hand the local building and safety department a copy of the district notification. That is why the survey, the notice and the permit application get lined up before a demolition date is set.
Call the district’s asbestos hotline at (909) 396-2336 to confirm what applies at your address, and ask the local building department what its counter asks for.

Since samples come first, asbestos testing is the best place to start, and the home page lists our other services.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (424) 435-4819