Example Asbestos Removal Projects in Torrance

The seven example jobs below are set in Torrance, Rancho Palos Verdes and Rolling Hills Estates. Every one lists the samples, the removal, the work days and an estimated cost.

Old 9-inch tile lifted from under newer vinyl in a 1950s ranch kitchen

Example project

Home
1950s ranch house in Torrance with newer sheet vinyl over the kitchen and nook
Original request
Replace the worn vinyl with a new floor through the kitchen and nook
Testing
A Cal/OSHA-certified asbestos consultant lifts a corner of the vinyl and samples the vinyl, the 9-inch tile under it and the mastic
Found
Asbestos in the 9-inch tile and its mastic
Clear
The newer sheet vinyl
Area
About 240 sq ft of kitchen and nook floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,300

Scope of work

Lab results for each layer, the district notice, the kitchen sealed with air filters running, the vinyl lifted off and the tile and mastic removed wet down to the subfloor, bagging and the haul. The clearance air test and the new floor are separate.

Project overview

In this example, a Torrance couple is replacing the vinyl in the kitchen and nook of their 1950s ranch house. The vinyl was laid in the 1990s, and a corner that has curled shows an older tile under it.

The older 9-inch tile and its mastic test positive, and the vinyl on top is clear. The abatement crew lifts the vinyl and removes the tile and mastic, so the installer works on a bare subfloor.

The goal

The goal is a bare kitchen subfloor, so the new floor is laid with nothing positive left beneath it.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant lifts a corner of the vinyl and samples every layer.
  2. Before work The abatement contractor files the district notice online.
  3. Day one The kitchen is sealed, the vinyl lifted and the tile taken up by hand.
  4. Day two The mastic is removed wet, the subfloor is cleaned and an independent consultant tests the air.

Planning right

  • Empty the cabinets near the floor the day before.
  • Ask the consultant to sample under the fridge and the range, too.
  • Order the new floor after the air results.
  • Keep the report with the house papers.

Get a free quoteMore about floor tile and mastic removal

Positive materials removed from a hillside house before it is demolished

Example project

Home
1960s single-story house on a hillside lot in Rancho Palos Verdes
Original request
Take the house down and rebuild on the same lot
Testing
A whole-house survey by a Cal/OSHA-certified asbestos consultant, about 30 samples from ceilings, floors, walls and ducts
Found
Asbestos in the ceiling texture throughout, the floor tile in the kitchen and baths and the wrap on the duct runs under the house
Clear
The wall compound and the window putty
Area
About 1,100 sq ft of ceiling, 300 sq ft of floor and 120 ft of duct wrap
Timeline
Notice no later than 10 working days ahead, then six working days before the wrecking crew
Cost
$27,000

Scope of work

Removal of every positive material in the survey, the district notice, rooms sealed in turn, wet removal into labeled bags, air monitoring and the haul with its paperwork. The survey, the demolition itself and the permits are separate.

Project overview

In this example, a family on a hillside lot in Rancho Palos Verdes is replacing a 1960s house. The city’s FAQ asks demolition applicants to get clearance from the district before applying for the city permit, and what the district takes is a Rule 1403 notification, filed online by the abatement contractor.

State law, as the district describes it, also has the applicant give the building department a copy of that notice. The survey comes first, the positive materials come out, and the wrecking crew starts afterwards.

The goal

The goal is a house with every positive material gone, so the wrecking crew can start on the day the permits allow.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room and the duct runs under the house.
  2. Before work The contractor files the district notice online, and a copy goes to the building department with the permit application.
  3. Days one to six Room by room the ceilings and floors come out wet, and the duct wrap is removed under the house.
  4. Last An independent consultant checks the air, and the wrecking crew starts.

Planning right

  • Order the survey as soon as the rebuild is planned.
  • Keep the district notice and the lab report together for the permit counter.
  • Ask the wrecking crew to wait for the air results.
  • Plan access for the work trucks on the hillside street.

Get a free quoteMore about renovation and demolition abatement

Wrapped attic ducts removed before a ranch house gets a new system

Example project

Home
1960s ranch house in Rolling Hills Estates with a furnace in the garage and ducts through the attic
Original request
Replace the furnace and every duct in the attic with a new system
Testing
A Cal/OSHA-certified asbestos consultant samples the duct wrap in three places and the tape at the registers
Found
Asbestos in the wrap on the main duct and its branches
Clear
The register tape
Area
About 210 ft of duct in the attic
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$4,900

Scope of work

The attic hatch and the furnace area sealed, wet removal of the wrapped duct into labeled bags, a cleanup and the haul. The survey, the clearance air test and the new ducts and furnace are separate.

Project overview

In this example, the owners of a 1960s ranch house in Rolling Hills Estates are replacing the heating and cooling system. Taking out the old ducts counts as renovation, so the survey comes before the heating company opens the attic.

The wrap on the main duct and its branches tests positive. The abatement crew removes the old duct run first, and the heating company brings the new ducts into a cleaned attic.

The goal

The goal is an attic with the old wrapped ducts gone, so the new system goes in clean.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap and the tape.
  2. Before work The contractor files the district notice online and the heating company holds its install date.
  3. Days one and two The hatch is sealed and the ducts are wetted, cut apart and bagged.
  4. Last An independent consultant tests the air, and the new system goes in.

Planning right

  • Clear the garage near the furnace ahead of time.
  • Ask the heating company to start after the air test.
  • Keep the lab report with the permit papers.
  • Plan for the old system to be out for a day or two.

Get a free quoteMore about HVAC duct and pipe insulation removal

Bathroom floor tile tested before a plumber cuts through it for a slab leak

Example project

Home
1960s house in Torrance with a bathroom floor of 6-inch tile over the slab
Original request
Repair a slab leak found under the bathroom, which means cutting through the tile and the concrete
Testing
A Cal/OSHA-certified asbestos consultant takes six samples of the tile, the mastic and the wall texture around the leak spot
Found
Asbestos in the floor tile and its mastic
Clear
The wall texture
Timeline
A visit of about an hour, results within a few days
Estimated testing cost
$550

Scope of work

A visit by the consultant, six samples, a lab result for each and a short report with the sample spots marked. Removing the tile is priced on its own.

Project overview

In this example, a leak detection company locates a slab leak under the bathroom floor of a 1960s Torrance house, and the plumber needs to open the floor above it. The owners ask for samples before anything is cut.

The tile and its mastic test positive and the wall texture is clear. The abatement crew will remove the tile in the work area first, then the plumber opens the slab and the tile setter relays the floor.

The goal

The goal is a slab repair that does not cut through positive tile, so the plumber waits for the lab result.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the tile, the mastic and the wall.
  2. A few days later Results come back with two positive materials and the wall clear.
  3. Next The abatement crew is booked to remove the tile in the work area.
  4. Then The plumber starts on the slab repair.

Planning right

  • Hold the plumber until the results are in.
  • Do not take samples yourself, the consultant knows what to cut.
  • Keep the report with the plumber’s estimate.
  • Ask about the bathroom fixtures coming off before removal.

Get a free quoteMore about asbestos testing and surveys

Stucco cut back around a sliding door that is being widened

Example project

Home
1950s ranch house in Torrance with a stucco exterior and a sliding door to the backyard
Original request
Widen the sliding door opening by about three feet for a bigger patio door
Testing
A Cal/OSHA-certified asbestos consultant samples the stucco finish coat, the base coat and the window caulk beside the door
Found
Asbestos in the stucco finish coat
Clear
The base coat and the caulk
Area
About 45 sq ft of stucco
Timeline
Less than 100 square feet in a single-unit house, so no district notice, then one working day
Cost
$2,200

Scope of work

Plastic along the wall and the ground, the stucco cut out wet in a strip around the new opening, bagging, a cleanup and the haul. The survey, the framing, the new door and the stucco patch are separate.

Project overview

In this example, a Torrance owner is widening the sliding door at the back of a 1950s ranch house. The stucco around the opening will be cut, and the finish coat is old enough to be sampled first.

The rule skips the survey and the district notice for a single-unit house when less than 100 square feet is removed, but the contractor waits for the lab result. The finish coat tests positive, so the abatement crew cuts it back wet before the framers touch the wall.

The goal

The goal is a clean strip of wall, so the new door is framed without cutting positive stucco.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the stucco coats and the caulk.
  2. A few days later Results show the finish coat positive and the rest clear.
  3. Work day Plastic goes up, the stucco strip is cut out wet and bagged.
  4. Then The framers open the wall and set the new door.

Planning right

  • Move patio furniture away from the wall the day before.
  • Mark the new opening width for the crew.
  • Keep the lab report with the door permit.
  • Order the stucco patch after the framing is done.

Get a free quoteMore about renovation and demolition abatement

Family room ceiling texture removed before track lighting goes in

Example project

Home
1960s house in Torrance with a family room under a textured ceiling
Original request
Add track lighting and a smooth ceiling in the family room
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture at two spots in the room
Found
Asbestos in the ceiling texture
Area
About 240 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$2,500

Scope of work

Two texture samples, the district notice, the room sealed with air filters running, the texture wetted and scraped into bags, a HEPA clean and the haul. The clearance air test, the lights and the new finish are separate.

Project overview

In this example, a family in Torrance wants track lighting in the family room and a smooth ceiling to go with it. The electrician will drill into the ceiling along the track, which would break up the texture.

Both samples test positive, so the abatement crew removes the texture from the whole room before the electrician drills, and the drywall finisher works on bare board.

The goal

The goal is a bare ceiling, so the track lighting and the new finish go in on clean board.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant takes two ceiling samples.
  2. Before work The contractor files the district notice online and the family empties the room.
  3. Day one The room is sealed and the texture is wetted and scraped.
  4. Day two The ceiling is wiped down, the bags are hauled out and an independent consultant tests the air.

Planning right

  • Move furniture out of the family room before work.
  • Mark the track location for the electrician.
  • Install the lights only after the air results.
  • Keep the lab report with the house papers.

Get a free quoteMore about popcorn ceiling removal

Wall compound removed from two bathrooms remodeled at the same time

Example project

Home
1960s house in Torrance with a hall bathroom and a primary bathroom side by side
Original request
Gut and rebuild both bathrooms in one project, with new tub and shower walls
Testing
A Cal/OSHA-certified asbestos consultant samples the wall joint compound and skim coat in both bathrooms, the ceilings and the floors
Found
Asbestos in the wall joint compound and skim coat of both bathrooms
Clear
The ceilings and the floors
Area
About 360 sq ft of bathroom wall
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$5,200

Scope of work

Both bathrooms sealed with air filters running, the positive wall compound removed wet down to the studs, bagging, a HEPA clean and the haul. The survey, the clearance air test, the plumbing and the new walls are separate.

Project overview

In this example, the owners of a 1960s house in Torrance are rebuilding the hall and primary bathrooms together to save time on permits and trades. Both bathrooms will lose their tub and shower walls down to the studs.

The wall compound and skim coat test positive in both rooms, the ceilings and floors are clear. The abatement crew removes the two sets of walls in one visit, and the plumber and tile setter start in clean framing.

The goal

The goal is bare studs in both bathrooms, so the remodel starts on clean framing.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the walls, ceilings and floors in both bathrooms.
  2. Before work The contractor files the district notice online and the owners plan a second bathroom to use.
  3. Days one to three Both bathrooms are sealed and the wall compound is removed wet, one room at a time.
  4. Last An independent consultant tests the air, then the plumber starts.

Planning right

  • Plan a place to wash up for the work days.
  • Keep the ceilings, which tested clear, for the remodel crew.
  • Order tile and fixtures after the air results.
  • Keep the lab report with the permit set.

Get a free quoteMore about drywall, joint compound and plaster removal

Request a free asbestos removal quote