Asbestos Removal in Rancho Palos Verdes

We handle asbestos testing, removal and remodel abatement for Rancho Palos Verdes homeowners and property managers. The jobs follow the survey, notice and waste rules of the South Coast Air Quality Management District, which lists the city among its incorporated cities.

The survey comes first, with samples taken by a certified consultant or technician, and we file the district notice online when the work reaches that point.

Request a free quote
Garage with painted block walls, a utility sink at the left beside old patterned vinyl floor tile, bare concrete elsewhere, a cabinet at the right and light through the garage door

How we can help

Testing first

Before a remodel or rebuild, asbestos testing samples each layer that the planned work will cut through or lift.

Ceilings

Texture can be disturbed by new lighting, a ceiling fan or a repaint. Sampling happens first, and a positive result leads to popcorn ceiling removal.

Floors

Each flooring layer in a Rancho Palos Verdes house gets its own sample, whether square tile, sheet vinyl or adhesive, and nothing is lifted until the lab reports. After that, floor tile and mastic removal can be planned.

Ducts and pipes

New equipment waits its turn. Duct wrap and pipe insulation are lab-tested first, and a positive result brings in HVAC duct and pipe insulation removal ahead of the HVAC change-out.

Rancho Palos Verdes housing

Only 2.7 percent of Rancho Palos Verdes homes date from before 1950, but more than 8 in every 10 were built before 1980, with the middle home built in or before 1967.

Owners, renters and apartments

About 83 percent of Rancho Palos Verdes homes are one-unit homes, and 19.6 percent are rented. Buildings with five or more units hold 15.3 percent of the homes. The small-job carve-outs are for single-unit houses alone, so an apartment building, a townhouse or a condominium never qualifies.

Demolition permits in Rancho Palos Verdes

The city’s building and safety FAQ tells demolition permit applicants to obtain clearance from the South Coast AQMD before they apply for the city permit. What the district takes is a Rule 1403 notification, so that is the step to plan for, filed no later than 10 working days before demolition.

State law adds that the applicant gives the local building and safety department a copy of that notification. Confirm your own address with the district or the city’s building department.

Attic with silver foil-wrapped round ducts along the rafters, plank flooring, loose insulation at the sides and light from a small vent window

Frequently asked questions

Does a small remodel still need a survey?

Only in one case. If a renovation of a residential single-unit dwelling strips or removes less than 100 square feet of surface area of asbestos-containing material, the survey requirement is waived. Demolition is never excused, and a test is still the way to learn how much there is.

Who takes the samples?

Samples come from a consultant or technician who is Cal/OSHA-certified and has EPA Building Inspector training. The lab report that follows covers only the places sampled, naming each one and its result.

What happens to the waste?

Material that is friable is hazardous waste in California, so a licensed hauler carries it away under a manifest. Nonfriable material is not caught by that rule, although other agencies may still restrict it.

See asbestos removal in Rolling Hills Estates, or return to the home page for each service and the rules behind it.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 435-4819

Call (424) 435-4819